Large Extension Cator Street SE15

Project description

skips

demoloition

weaste pipes and manhole (move manhole excl fees to thames water if needed)

dig fundation (Manual work, taking the soil in bags through the building)

fundation, concrete (Manual work, carrying material through the building,mixing concrete on

site)

brickwork (thermolite blocks internal and external)

remove and rebuild party wall,lest and right one, use thermolite bloks and sand and cement

render

steel beams and concrete pad stones

GRP Roof and roof insulation with gutters and facia

Concrete floor with insulation

existing floor ventilation

plumbing for new extension and utility room (incl three radiators) first fix only

move boiler incl certyficate

Electrical, 30 new points, 1st and 2nd fix with white facia, new extractors for kitchen and

bathroom




make good new opening , new plasterboard and plastering

internal render

Make good around newly fixted windows, section in livingroom

plastering to new section

external render extension and party walls

Fitting for velux

remove existing paving bricks and put back after extension is done

fix staines steel drain chanel with plastic bottom try

partition walls

remove and rebuild part off front brick fence, remove and rebiuld part off front wall and part

of front paving

Project location

173 cator street, SE15 6AA London